top of page
Florida Keys Aerial View from airplane.jpg

Roadway Vulnerability Analysis

​

Monroe County - Unincorporated

​​

​

​

Municipal Roadways

​

​

​

About the Projects

​Monroe County's Roadway Vulnerability Study and Capital Plan was completed in 2024, merging climate change science and modeling, with transportation engineering and planning to develop a long-term roads adaptation plan based on design criteria, SLR projections, adaptation methodology, policy/financing evaluation, and public/stakeholder outreach.  The primary objective of the project was to analyze the impacts of current and projected levels of SLR on all County Maintained roads and stormwater features, and to develop an implementation plan and timeline to adapt roads and drainage for future SLR. The results will also be used to determine new policy considerations and design criteria for what acceptable levels of service should be for County maintained roads. 

​

The scope of the original study only included County-maintained roads, a continuation of this study is currently underway for the municipalities of the Village of Islamorada, City of Layton, City of Key Colony Beach, and the City of Marathon. The City-maintained roadways will be analyzed using the same approach used in the County study, and the same type of deliverables will be developed for each of the four municipalities at the conclusion of this new study. 

img-png-wsp-red.png
MCLogo.png
KBCLogo.png

305-453-8774 
1100 Simonton Street
Key West, FL 33040

bottom of page